No.99, 3rd Floor, Infantry Road Cross
Bangalore - 560001, INDIA
Top

Bliss

FineLine > Bliss

RERA No : PRM/KA/RERA/1251/309/PR/200205/003239

With close proximity to Manyata Tech Park,
FINELINE BLISS is strategically located in Bangalore’s most promising new neighborhood.

Designed considering the creative minds of the IT Industry, these 83 apartments of 2, 2.5 and 3-Bedrooms are planned for optimum space utilization and equipped with amenities for a modern lifestyle.

LOCATION

PERSPECTIVE VIEW

AMENETIES

The Clubhouse at FINELINE BLISS is loaded with facilities to suit every need –  Health conscious facilities, Party hall, landscaped portions and a Tot-lot area for your kids to enjoy the evening sun.

More sporty option will be to hit the gym or dribble at the basketball court to stay fit & active.

A dip in the swimming pool will  drain out all the stress you had at work or even make the kids’ day as they take a splash in the pool

60fff85083bf21ccb0eae0af481

FLOOR PLANS

UNIT PLANS

Bliss is when the morning sun teases you through the windows and stays with you till the evening

Well planned cozy apartments that are three sides open. The space plannin outside the apartment allows ample natural light throughout the day reducing your usage of artificial light. Free flow of fresh air all around makes for the healthy sanctuary that is so scarce in the city.

Vaastu-compliant homes that bring Peace, Serenity, Well spaced rooms, Balanced openings for abundant air flow and sunlight throughout the day.

SPECIFICATIONS

Strcuture

Structure

  • RCC Frame Structure
  • Complete RCC Fin in Elevation
  • All doors and window lintel level at Beam bottom ht.
  • 8″ Solid cement blocks for exterior walls
  • 6″ Solid cement blocks for interior walls
Flooring

Flooring

  • Vitrified Flooring in the Foyer, Living, Dining, Bedroom and Family room.
  • Anti-skid ceramic tiles in Balconies.
Doors

Doors

  • Main Door – Hard wood frame with skin molded paneled/flush shutters. Good quality hinges, tower bolt, lock, door stopper bush and security eye provided with door.
  • Other Doors – Hard wood frame with enamel painted, skin molded paneled/flush shutters with hinges, tower bolt and lock.
  • MS Powder coated Aluminum hardware for all the doors.
Windows

Windows

  • UPVC sliding windows with mosquito nets.
  • Toilet ventilators made up of UPVC with glazed louvers/fixed glass with provision for exhaust fan.
Finishes

Finishes

  • ACE paint on external walls, internal
  • walls and ceilings in distemper.
  • All railings and inside doors in enamel paint.
  • Main door in melamine polish.
Electrical

Electrical

  • ISI marked cables using copper wiring through PVC conduits concealed in walls and ceilings.
  • Good quality modular electrical switches will be provided.
  • Provision for split A/C units in Master bedroom.
  • Provision for geysers in all Bathrooms.
  • All units will be provided with 3 KW power with energy meter.
  • Provision for Water Purifier, Instant geyser, Chimney and Hob in Kitchen.
  • Solar Water heaters exclusively for third floor units.DG POWER
  • 1kVA Lighting power backup for all units.
  • 100% Power backup for lifts and Common Areas
Bathroom

Bathroom

  • Anti-skid ceramic tiles for flooring, ceramic tiles on walls.
  • EWC, Wash Basin with Pedestal of reputed make in all bathrooms.
  • CP Fittings of reputed make in all bathrooms.
Lobby

Lobby

  • Lobby flooring and wall cladding in combination of Granite and Ceramic tiles.
  • All lobby walls in texture paint and ceilings in distemper.
  • Staircase and Service Lobby in granite.
  • 2 Elevators of reputed make of suitable capacity.
Security

Security

  • Security cabins at all entrances and exits with CCTV
    coverage on perimeter and lobbies.
  • An intercom from security room to each flat and intercom facility between the flats.
Clubhouse

Clubhouse

  • Half Basketball court.
  • Swimming Pool with separate Kids pool.
  • Tot-Lot Play Area.
  • Indoor Games.
  • Gym Room.
  • Multi-purpose Hall.

FAQ’s

01 Q.Where and what is FINELINE BLISS?

A: FINELINE BLISS is located behind manyata tech park in Rachenahalli (Refer the Location Plan) Bangalore. This is a Residential Development with S+G+3 Floors. There are 83 flats and a Clubhouse.

02 Q.What are the different types and sizes of Flats?

A: FINELINE BLISS consists of 2, 2.5 and 3 Bedroom flats, to fit every family size and budget.

03 Q: Is there differential pricing based on the floors or orientation of flats?

A: No! There is no differential pricing for flats at different floors.

04 Q: What are the Amenities at the project?

A: FINELINE BLISS has a Clubhouse equipped with a Gymnasium, Swimming pool, Health club, Community hall, Table Tennis, Billiards, Tot-Lot area, indoor games area, and half basketball court.

05 Q: How do l book my Home at FINELINE BLISS?
  • A: Identify your flats.
  • Fill the Booking Application Form.
  • Pay by Cheque/DD

The Booking Amount is Rs.50’000.

06 Q: What happens thereafter?

A: You will be required to pay the 10% of the Sale Value at the time of signing of Agreement of sale and the balance payment as per stage of completion within 30 days.

07 Q: Can I make a 100% down payment?

A: Yes, please check with the Sales Manager for more details.

08 Q: How are installments to be paid and is it time bound?

A: Installments are to be paid by way of Post Dated Cheques which is a pre-condition of the allotment. This schedule of payment is on a time bound basis as mentioned in the payment schedule. If the Cheques are dishonoured the Booking stands cancelled.

09 Q: Are modifications permitted?

A: FINELINE BLISS has been master planned with a design theme. External and internal finishes have been carefully chosen. Considering the timelines of delivery and also in keeping with the design theme, we will be unable to accept any changes/modification requests

10 Q: When does the development start and when can I expect to move into my new home?

A: Construction is under progress and you can expect to move into your new home by December 2022.

11 Q: What about Car Parking Space?

A: We provide one car park space for every flat. Additional car parking requests will be taken up towards project completion, at an Additional Cost.

12 Q: Is the title of the property clear?

A: All our Projects have been known for strong and clear titles. The land is freehold, marketable and free from all encumbrances.

13 Q: Has the BBMP/BDA sanctioned the plans?

A: Yes, the development plan has been sanctioned by the BBMP and the Approval number is BBMP/Ad.Com./YLK/0118/19-20

14 Q: What are the Agreements that need to be signed?

A: The agreements that need to be signed are Agreement of Sale followed by a Sale Deed.

15 Q: Is the project RERA registered?

A: Yes, project is RERA registered and the Reg no is – PRM/KA/RERA/1251/309/PR/200205/003239

16 Q: Has the project received CC?

A: Yes, the project has been granted Commencement Certificate (CC).

17 Q: What is the process of registration and when does registration take place?

A: Registration will be done only on completion of the development and on payment of the entire sale consideration including the additional charges. Registration will be facilitated by us through an advocate appointed by FINELINE INFRA Pvt. Ltd.

18 Q: Has AL-ZASSZ Infrastructure Pvt. Ltd. been approved by Banks/Housing Finance Institutions (HFIs) for loans?

A: Yes. All Leading HFIs have approved the development and will fund the loans to customers based on their specified criteria.

19 Q: What is my responsibility for disbursement of installments through HFIs?

A: It is Clients responsibility to ensure timely disbursement of installments from HFIs based on the construction linked payment plan.

20 Q:What happens if I have any more questions/clarifications?

Please Email us to [email protected] or call us at +91 99 16 987 987

Contact Bliss
close slider